The proposed PSPP is located in West Java near the border with Central Java, about 300 km south East of Jakarta on the Cijolang River. The adopted PSPP layout foresees a totally underground solution and, among other elements, it includes:
- Upper Reservoir, effective volume of 3,484,748m³, water operating level ranging from max 714m a.s.l. to min 684.5m.
- Underground powerhouse 53m high, with 4 Francis single stage reversible pump-turbine Units, each rated at 175MW or 225MW, for total 700 MW (5h generation) or 900 MW (4h generation) respectively.
- Lower Reservoir, with an effective volume of 3,503,480m³ and operating level ranging from max 272.8m a.s.l. to min 290.8m.
- Outdoor 500 kV switchyard dispatching power through 500 kV transmission line.
ELC (along with a JV partner) was engaged to conduct Pre-feasibility Study Update and Feasibility Level Design.
Photo Gallery - Matenggeng Pumped Storage Power Plant
- Details
- Written by Administrator
- Category: ELC Indonesia
- Hits: 6167
The project is located in South Sumatra Province, about 200 km South-West of Palembang.
Actual services provided by ELC within the assignment are the following:
- Review of the previous geoscientific studies;
- Elaboration of the conceptual model of the field;
- Elabration of the front end engineering design (FEED), to be utilized for the preparation of the Bidding Document (EPC-turnkey) for the Power Plants Unit 1 and Unit 2;
- Well Targeting;
- Assistance to the Client during the procurement of the EPC contractors;
- Monitoring and supervision during construction;
- Design Review;
- Monitoring of environmental and social issues;
- Transfer of knowledge to Client’s personnel;
- Assistance during testing and commissioning of the power plants;
- Assistance during the warranty period
VIDEO
http://www.thinkgeoenergy.com/video-lumut-balai-geothermal-project-in-south-sumatra-indonesia/
Photo Gallery - Lumut Balai
- Details
- Written by Administrator
- Category: ELC Indonesia
- Hits: 6270
The project is located in Bengkulu Province, about 80 km north of Bengkulu City.
Actual services provided by ELC within the assignment are the following:
- Feasibility study, including a justification of the Project, the assessment of the geothermal resources, the conceptual design of the facilities, the economic and financial analysis and the social-environmental assessment;
- Assistance in the pre-qualification process, through preparation of the P/Q documents, evaluation of bids and selection of qualified bidders;
- Assistance in the preparation of the Bidd.ing Documents, including Front End Engineering Design of the Geothermal Power Plants (GPPs), elaboration of the
- Tecimical Specifications, Bill of Quantities, Schedule of Activities and Cost Estimate and preparation of the whole Tender package;
- Design Review;
- Monitoring of environmental and social issues;
- Transfer of knowledge to Client’s personnel;
- Assistance during testing and commissioning of the power plants;
- Assistance during the warranty period.
Photo Gallery - Hululais Geothermal Power Plant
- Details
- Written by Administrator
- Category: ELC Indonesia
- Hits: 7303
Major Ongoing Projects in Indonesia
- Lumut Balai Geothermal Power Plants Project (2x55 MW) - PT. Pertamina Geothermal Energy (LINK)
The project is located in South Sumatra Province, about 200 km South-West of Palembang.
Actual services provided by ELC within the assignment are the following :
- Review of the previous geoscientific studies;
- Elaboration of the conceptual model of the field;
- Elaboration of the front end engineering design (FEED), to be utilized for the preparation of the Bidding Document (EPC-turnkey) for the Power Plants Unit 1 and Unit 2
- Well Targeting;
- Assistance to the Client during the procurement of the EPC contractors;
- Monitoring and supervision during construction;
- Design Review;
- Monitoring of environmental and social issues;
- Transfer of knowledge to Client’s personnel;
- Assistance during testing and commissioning of the power plants;
- Assistance during the warranty period